How to Choose a Solar Installer (Without Getting Burned)
Solar installation complaints follow a predictable pattern in both Australia and the US: door-knocking sales pressure, vague or missing itemised quotes, and installers who disappear (or fold the business) before a warranty claim comes due. Here's what actually separates a reliable installer from a risky one.
Check accreditation — don't take their word for it
In Australia, look up the installer's accreditation directly on the Clean Energy Council website rather than trusting a logo on their van — accreditation is tied to the individual installer, not just the company. In the US, look for NABCEP certification (North American Board of Certified Energy Practitioners) for the specific person doing the design and install, plus your state's electrical licensing board for the licensed electrician on the job.
Get at least three itemised quotes
A trustworthy quote itemises: panel brand, model and count; inverter brand and model; mounting/racking hardware; any battery hardware separately; labour; and any switchboard or metering upgrade work. A single bundled "system price" with no line items makes it impossible to compare quotes on equal terms or spot where corners are being cut.
Ask about the warranty chain, not just the headline number
Panel manufacturers commonly advertise 25-year product and performance warranties, but that warranty is only as good as the manufacturer's ongoing presence in your market — ask how long the brand has been selling in your country, and separately confirm the installer's own workmanship warranty (commonly much shorter, and the one that actually covers most real-world failure points like flashing, wiring and mounting).
Red flags
- Unsolicited door-knocking or high-pressure same-day-signature discounts.
- A quote significantly below the other two or three you collected, with no clear explanation (commonly a sign of an undersized inverter, lower-tier panels than described, or a plan to skip required inspections).
- No fixed business address, or a business registered only a few months ago with no verifiable completed local installs.
- Reluctance to provide the datasheet for the specific panel and inverter models in the quote.
After the install
Get the compliance certificate/paperwork (grid connection approval, any rebate/certificate documentation, electrical safety compliance) in writing before final payment, not promised "to follow" — this documentation is what you'll need for warranty claims, resale, and (in Australia) your STC rebate assignment.
Bottom line
Verify accreditation independently, collect itemised quotes from at least three installers, and separate the panel manufacturer's warranty from the installer's workmanship warranty before you sign anything.
Mia tracks energy-rebate programs across both countries and writes the program guides — what changed, what expired, and what to check before you rely on a figure.
Energy-policy research background.