I still see EV charger quotes come in as a flat price with no mention of the switchboard, and it's the single biggest predictor of a job that ends up costing more than the number on the page. This is editorial guidance on what to check before you sign, not a directory or referral service. We don't list or recommend specific businesses.

Licensing is the non-negotiable baseline

In Australia, EV charger installation is licensed electrical work and must be done by a licensed electrician. Ask for their licence number and, if it matters to you, check it against your state's electrical licensing register, which is a genuinely quick step most people skip. In the US, confirm the electrician is licensed in your state and, ideally, has specific familiarity with EV charging equipment requirements under NEC Article 625, not just general residential wiring experience. A licence covers competence to do electrical work generally. It doesn't guarantee EV-specific experience, which is a separate thing worth asking about directly.

What a proper quote should include

A quote worth trusting should reference an actual switchboard capacity assessment, checking your main switch rating, available spare circuit capacity, and whether your existing consumer mains can carry the new load, rather than assuming there's room. It should specify the cable size relative to the actual run length from the switchboard to the charger location, since a longer run needs a heavier gauge to manage voltage drop properly. It should state clearly what happens if the assessment finds insufficient capacity: is an upgrade included in the price, or a separate variation you'll be asked to approve? And it should confirm testing and certification will be completed and documented after install, not just "the charger will work."

Red flags worth walking away from

A verbal-only quote with no site inspection of the switchboard is the biggest one. I wouldn't accept a fixed price for an EV charger install from anyone who hasn't actually opened your switchboard first. A quote that seems noticeably cheaper than others for a comparable scope is worth asking hard questions about, specifically what cable size and switchboard work is, or isn't, included. An installer who can't clearly explain three-phase versus single-phase implications for your specific home, if that's relevant to you, probably hasn't done many of these. And genuine pressure to sign on the spot, particularly from a door-knocking sales approach rather than a quote you can take time to compare, is a pattern worth being wary of generally, not just for EV chargers specifically.

What happens on install day, so you know what to expect

A properly run install typically starts with the electrician re-confirming the switchboard assessment before opening anything, running the new circuit (through wall cavities, ceiling space or conduit depending on your home), mounting and wiring the charger unit itself, then testing and commissioning, checking earth fault protection, load-balancing settings if applicable, and confirming the charger actually communicates correctly with the vehicle. Ask roughly how long the job should take before it starts. A straightforward install without switchboard complications is usually a matter of hours, not days, and a job dragging on well beyond the quoted time without explanation is worth querying.

Questions I'd actually ask

Has the switchboard been assessed, and what's the finding? What cable gauge is specified, and does it account for the actual run length? What happens if the switchboard needs an upgrade, is that priced in or separate? Will the installer provide test and compliance documentation after the job? And, for a home with three-phase supply already reticulated, has the installer discussed whether a three-phase charger makes sense for your charging needs versus a cheaper single-phase unit?

My honest take

I'd rather pay a bit more for a quote that clearly includes a proper switchboard assessment than save money on one that doesn't and risk a mid-job variation once the panel's actually open. The charger hardware itself is close to a commodity at this point. The installation quality and the honesty of the quoting process are where the real differentiation between installers actually sits.

See our deeper look at EV charger amperage and circuit sizing for the technical detail behind what a proper assessment should cover, and our EV charger buying guide for choosing the charger itself.

Australian wiring standards sit under AS/NZS 3000, and in the US the National Electrical Code (NFPA 70) governs EV charging installations under Article 625, both worth referencing directly if an installer's explanation doesn't add up.

Comparing quotes side by side

Once you've got two or three quotes, lay out the switchboard assessment finding, cable specification, charger model, and total price for each side by side rather than comparing bottom-line numbers alone. A cheaper quote missing a switchboard assessment isn't actually cheaper once you account for the real possibility of an unbudgeted upgrade mid-job. I'd rather see a client pay a bit more for genuine cost certainty than gamble on a bare-bones quote that could turn into a much bigger number once the switchboard is actually opened.

After the install

Once the charger's in, ask for the test and compliance certificate, and keep it somewhere safe alongside your home's other electrical documentation. If you ever sell the property, or need to make an insurance claim involving the electrical system, having documented proof of a properly certified install matters. It's a small piece of paperwork that's easy to lose track of and genuinely useful to have on hand years later.

A short story on why I check the switchboard myself now

Early in my time doing this work I took a client's word that "the board's fine, it's only a few years old" and priced the job without opening it. It turned out the board had been upgraded years earlier but the consumer mains feeding it hadn't, a mismatch that wasn't obvious from the outside and that a proper assessment would have caught immediately. We caught it before any real problem, but it added a day and a genuinely awkward conversation about scope that a five-minute inspection at quote stage would have avoided entirely. I don't skip that inspection anymore, for anyone, regardless of how confident the homeowner sounds about their own switchboard's condition.

Getting it in writing before the crew arrives

Once you've picked an installer, get the final scope, cable size, switchboard findings, charger model and mounting location, confirmed in writing before the job is scheduled, not just discussed verbally at the quote appointment. Memories of a verbal conversation drift, and a written scope is what you'd point back to if the completed job doesn't match what was discussed.

— Declan Osei, Battery & EV charging

Tagged

Common questions

Should I use the EV manufacturer's recommended installer or my own electrician?
Either can work well. A manufacturer-recommended installer often has specific model familiarity, while your own trusted electrician has the advantage of already knowing your home's wiring history. What matters more than the source of the referral is whether they actually do the switchboard assessment properly.
How many quotes should I get?
At least two, ideally three, specifically because switchboard assessments and cable-run recommendations can vary between installers. A wide spread in quoted scope, not just price, is useful information about how thoroughly each one actually looked at your home.
About the author
DO
Declan Osei
Battery & EV charging · Brisbane, AU

Declan writes about home batteries, EV chargers and the emerging vehicle-to-grid category, drawing on his own multi-year EV ownership.

EV owner since 2019; home-charging enthusiast.

More from Declan Osei